AI-accelerated · Chartered-engineer verified

Temporary works,
engineered with certainty.

Impact Formwork is an AI-assisted formwork & falsework consultancy for civil engineering. We compress design, load verification and pour sequencing from weeks to days — every output signed off by a chartered temporary-works engineer.

BS 5975 & EN 12812 aligned CDM 2015 temporary works PI-insured & independently checked

Trusted on schemes for main contractors & civils specialists

GROUNDLINEPEAK CIVILSNORTHBRIDGEVERTEX INFRACALEDON GROUP
0
% faster design turnaround
0
temporary-works schemes verified
0
% chartered-engineer sign-off
0
avg. hours to a checked scheme
What we do

Formwork & falsework, end-to-end.

Every discipline of temporary works for civils — from a single pour to a full falsework deck — with the AI layer doing the heavy lifting and our engineers owning the risk.

Formwork design

Wall, column, soffit and bespoke formwork designed to BS 5975. Panel layouts, tie patterns and pour heights optimised against your available kit — Peri, Doka, RMD or proprietary.

Design · Drawings · Kit schedule

Falsework & load verification

Falsework towers, birdcage and beam-and-prop decks checked to EN 12812. Concrete pressure, wind, construction and imposed loads modelled — with foundation bearing pressures resolved.

EN 12812 · Load cases · Stability

Pour sequencing

Concrete pour rate, striking times and lift sequencing modelled against ambient temperature and mix design — so you strike safely, early, and hit the programme.

Rate · Maturity · Strike

Independent checking

Cat 2 & Cat 3 independent design checks on your own or a third party's temporary works. A fresh, credentialled set of eyes with a full check certificate.

Cat 2 · Cat 3 · Certificate

TWC advisory & documentation

Temporary Works Coordinator support, design briefs, risk registers and the full BS 5975 procedural pack — ready to drop into your CDM file.

TWC · Register · CDM file

Rapid design triage

A buildability or feasibility answer in hours, not weeks. Drop us a sketch or a photo from site and get a first-pass scheme and a risk read before you commit resource.

Same-day · Feasibility · Sketch-in
Why Impact Formwork

AI does the iterations.
Engineers own the risk.

The bottleneck in temporary works has never been the calculation — it's the iteration. Our AI layer runs hundreds of design permutations, load combinations and kit options in minutes. A chartered engineer then interrogates, adjusts and signs. You get speed without ever outsourcing the judgement.

  • No black boxesEvery AI-generated figure is traceable to the clause and load case it came from. You see the working, not just the answer.
  • Human sign-off, alwaysNothing leaves without a named chartered engineer's stamp. The AI accelerates; it never certifies.
  • Priced against your kitSchemes designed around the formwork and falsework you already own or hire — cutting kit spend, not just design time.
LOAD: 42.6 kN/m² UTIL 0.83 FoS 2.1 · PASS
How it runs

From enquiry to checked scheme in four steps.

Brief & sketch-in

Send drawings, a sketch or a site photo with your loads, kit and programme constraints. A 20-minute call scopes it.

AI iteration

The AI layer generates candidate schemes, runs every load combination and returns the shortlist that clears code with margin.

Engineer review

A chartered temporary-works engineer interrogates the output, adjusts for buildability and stamps the design.

Issue & support

You receive drawings, calcs, kit schedule and a check certificate — plus TWC support through the pour.

The AI layer

Purpose-built for temporary works — not a generic chatbot.

Our models are grounded in the codes, load tables and proprietary kit data that govern formwork and falsework. They reason over concrete pressure curves, striking maturity and stability — surfacing the numbers, the clause and the confidence for an engineer to verify.

BS 5975 EN 12812 EN 1991-1-6 Concrete pressure (CIRIA 108) Wind loading Foundation bearing Strike maturity
Concrete pressure checkPASS
Tie / prop utilisation0.83 PASS
Falsework stability (EN 12812)FoS 2.1 PASS
Wind (out of service)ENGINEER REVIEW
Foundation bearing pressure148 kPa PASS
Strike time @ 12°C36 hr OK
The standard we hold
“Speed means nothing in temporary works if you can't stand behind the number. Impact Formwork gives us both — a scheme back the same week, and a chartered stamp we'd defend in front of anyone.
Temporary Works Coordinator · Tier-1 civils main contractor
Book a review

Get a checked scheme moving.

Tell us the pour, the deck or the deadline. We'll come back within one working day with a scope, a price and a turnaround.

Email
hello@impactformwork.co.uk
Design desk
+44 (0)1234 567 890
Coverage
UK-wide · Remote & on-site

No obligation · Reviewed by a chartered engineer · One-working-day reply

Certainty, at the speed of your programme.

Stop waiting weeks for a temporary works design you then have to check yourself.

Book a design review
Enquiry sent — we'll reply within one working day.